Get HCM digital magazine and ezines FREE
Sign up here ▸
Jobs   News   Features   Products   Magazine      Advertise  
Promotional Feature
Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process


For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.


Follow the series
1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
FEATURED SUPPLIERS

Sue Anstiss' Game Changers podcast headed for Elevate 2024
Join us at Elevate from 12-13 June in London for a special one-off live recording of The Game Changers Podcast with Sue Anstiss, CEO of Fearless Women. [more...]

W3Fit EMEA’s innovative programme sets sail for Sardinia, Italy
Following a hugely successful event last year in Split, Croatia, W3Fit EMEA, is heading to the Chia Laguna resort in Sardinia from 8-11 October. [more...]
+ More featured suppliers  
COMPANY PROFILES
Orbit4

Orbit4 is the ultimate software solution for operators to manage their fitness facility. [more...]
Life Fitness

The Life Fitness family of brands offers an unrivalled product portfolio, providing customers with a [more...]
+ More profiles  
CATALOGUE GALLERY
 
+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

08-08 May 2024

Hospitality Design Conference

Hotel Melià , Milano , Italy
10-12 May 2024

Asia Pool & Spa Expo

China Import & Export Fair Complex, Guangzhou, China
+ More diary  
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
HCM
LEISURE OPPORTUNITIES
HEALTH CLUB HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024
Get HCM digital magazine and ezines FREE
Sign up here ▸
Jobs    News   Products   Magazine
Promotional Feature
Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process


For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.


Follow the series
1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
LATEST NEWS
Peloton considers de-listing to draw a line under pandemic challenges
Peloton Interactive Inc is believed to be working to get its costs under control in a bid to align with the expectations of private equity investors as it considers de-listing.
Equinox teams up with Dr Mark Hyman's Function Health to offer $40k annual healthspan programme
Equinox, has teamed up with health platform, Function Health, to offer 100 comprehensive laboratory tests, giving members vital insights into their internal health.
'Huff and Puff' – Australian research emphasises the importance of keeping up the cardio
Having good levels of cardiorespiratory fitness cuts disease and premature death by 11 to 17 per cent according to new research from the University of South Australia.
Active Oxfordshire secures £1.3 million to tackle shocking levels of inequality
Active Oxfordshire has received £1.3 million to tackle inactivity and inequality and launch a new programme for children.
Barry’s considers next investor move, as North Castle Partners looks to exit
Barry’s – known for its HIIT workouts combining treadmills and weights – is thought to be looking at strategic options, including taking on a new backer.
Providence Equity Partners takes control of VivaGym and its Fitness Hut brand
US private equity fund, Providence Equity Partners, is acquiring a majority stake in VivaGym from Bridges Fund Management, which will exit as a shareholder. Financial terms have not been disclosed.
Bannatyne has bounced back from the pandemic
The Bannatyne Group says it has officially bounced back from the pandemic, with both turnover and profits restored to pre-2020 levels in 2023, according to its year-end results.
Basic-Fit hints Spanish Holmes Place clubs might be sold
There is speculation that Basic Fit will sell the five Spanish Holmes Place clubs it has just acquired from RSG Group in a 47-club deal.
Nuffield Health calls for National Movement Strategy as research shows decline in fitness levels among some consumers
Nuffield Health’s fourth annual survey, the Healthier Nation Index, has found people moved slightly more in 2023 than 2022, but almost 75 per cent are still not meeting WHO guidelines.
Immediate rewards can motivate people to exercise, finds new research
Short-term incentives for exercise, such as using daily reminders, rewards or games, can lead to sustained increases in activity according to new research.
RSG opens flagship John Reed in Berlin, as its builds out its 'world city' portfolio
With the launch of its 49th John Reed, RSG Group is looking for more opportunities for its high- end brand in the US and Europe, but is pausing UK expansion.
PureGym's new results set it up for accelerating growth
PureGym saw revenues rise by 15 per cent in 2023, with the company announcing plans to develop 200 new clubs in the next three to four years.
+ More news   
 
FEATURED SUPPLIERS

Sue Anstiss' Game Changers podcast headed for Elevate 2024
Join us at Elevate from 12-13 June in London for a special one-off live recording of The Game Changers Podcast with Sue Anstiss, CEO of Fearless Women. [more...]

W3Fit EMEA’s innovative programme sets sail for Sardinia, Italy
Following a hugely successful event last year in Split, Croatia, W3Fit EMEA, is heading to the Chia Laguna resort in Sardinia from 8-11 October. [more...]
+ More featured suppliers  
COMPANY PROFILES
Orbit4

Orbit4 is the ultimate software solution for operators to manage their fitness facility. [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

08-08 May 2024

Hospitality Design Conference

Hotel Melià , Milano , Italy
10-12 May 2024

Asia Pool & Spa Expo

China Import & Export Fair Complex, Guangzhou, China
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS